Project Scope
- Design and construction of an ammunition preparation building (APB) to NATO specifications.
- The design features a pitched roof formed with the Spantech 300 Series Straight Panel.
- The panels cover the main entrance and loading area with a single unsupported span of 8 metres. The straight panel is also used on the external walls and as permanent formwork in selected areas of the structure.